Thursday, March 9, 2006

Shopping With No Under The Skirt Movie

Padulle, the story (first part)

The following was written in summer 2003, just before the adoption of the plan for urbanization of the area C5. It 's a history, commentary, ranging from the genesis of the General Plan (PRG) of the town of Rimini summer 2003.

Padulle The area, interested detailed plan by the consortium currently pending, is identified by the PRG as Zone C5. 5 C
zones are defined by the PRG itself as "areas in the course of urbanization, or to be developed in addition to the established suburbs." Despite the uniformity of the intended use and recognition of the same type of zone C they are subject to different rules.
To most of them have been assigned a building index equal to 0.4 square meters per square meter to other, including the area C5, which is also close to the center, equivalent to 0.2 sq m / sq.
And now this is hard to justify in view of a rational land use.
But we see in detail the proposed rule for the area C5.

La Norma

23.2.5 - C5 ZONE - SPECIAL RESIDENTIAL ZONE EXPANSION SUBJECT TO DETAILED PLAN CONSORTIUM
the C5 sub-region includes a summary of residential areas characterized by a widespread separation of ownership and for which the PRG aims to identify a land area for each of the existing property, regardless of the splits after 28/2/1994, the date of first presentation to the City Council of the PRG.
All operations are subject to development plan public initiative.
builders Parameters:
· H = 7.50 m.
· Ut = 0.2 sq m / sq. to be divided equally to each Sf as defined above.

Destinations:
Vale glove provided for the C1 area.


This standard is already quite a troubled history. In the initial drafting of the plan
Benevolent rule had a different form. Explicitly provided for a building area of \u200b\u200b400 square meters for each owner, regardless of the extension of the property.
This aspect of the rule, obviously unfit to enable a rational land use and violating the rights of owners of plots of much greater magnitude, was first the subject of several comments from citizens and ignored, without substantially founded, the local authority.
was then covered by the observations of the Province that she asked to delete all of the standard explicit quantification of the maximum area for each building owner.
Observations of the province were not ignored, but "around" with a formal artifice that brought pursuant to its final form. This form is inherently ambiguous (and ungrammatical), but in intention and interpretation that was later given by the municipality, repeats verbatim the same type of bond that the County had asked to remove.

We meet so far with legislation that, in beyond any doubt of interpretation, specifically assigns the same building capacity in all the affected properties, regardless of their extension, just as did the original version, Cassata for this by the Province. That is patently absurd.

The ambiguity of the rule, that senior figures in the city administration, as the commissioner Melucci even have repeatedly tried to present as an element of flexibility in the rule itself was already a source of problems for the administration.
Faced with requests for clarification through the offices of the ombudsman the administration has shunned for over a year his duties by not supplying the requested clarification.
The "clarification", if one can speak of explanations, they arrived at a time when the city administration has decided (two years late) to prepare a regulation for the collection of ICI on the land area of \u200b\u200bC5 ( on which you can still build, but where it is already required to pay the ICI as building land).
same document that purports to clarify the meaning of the rule, at least for the payment of the ICI, it continues to be confusion between ownership (as a country) and owner (owner of property). In another document
"Clarifying" the engineer. From Prato in fact implicitly admits that the rule itself is ambiguous and unclear.
interpretative issues have been raised about the meaning of the words "without taking into account the splits after 28/2/1994.
E 'then the verdict of the recent Joint Committee composed of qualified engineers and representatives of municipal urban planning for engineers who insists that the rule is ambiguous, contradictory and unclear.

The ambiguity of the rule and the arbitrariness and unfairness of the criteria for allocation of development rights which it has entered in violation of the most basic criteria equalization is based then an appeal to the TAR submitted to the same standard by some citizens.

addition to what has been said we have to add that the proposed rule ends up rewarding the subdivision of agricultural land, a practice known to be prohibited by law.
fact can not be excluded that some of the subdivisions as at 28.02.1994 has been made in optical speculative and therefore against the law.
E 'is known that even some of the promoters of the consortium have repeatedly publicly declared themselves to have proposed this type of legislation (which actually rewards the splits) to the technicians responsible for drafting the PRG.

The concrete interpretation of the rule at the time drafting the detailed plan ends up rewarding practice against another law, that of unauthorized construction.
Indeed it was decided (in a rather arbitrary, because this rule does not say anything of the PRG) to share development rights with policies that are independent of the distribution of the existing building (of which a considerable part consists of abuses condoned).
has in fact decided to separate the existing building built in the area provided by the standard C5 and distribute what is left between the owners apart from the existing building.
So owners of vacant land shall be granted the same ability to build new that is granted to owners of land on which already insist on buildings (including several condoned abuse), adding to inequality inequality.

Despite all the trouble and problems that the standard is ambiguous, irregular and has already caused and will cause, if not remedied, the assessor Melucci recently and on several occasions expressed their satisfaction and their satisfaction with the success of ' urban experiment attempted to Padulle and even the intention to propose such legislation elsewhere (and is already in place imaginable is a race to the subdivision of those areas on which there is no intention to repeat what has been done in the area C5).
councilor Melucci satisfaction is derived primarily from relatively high percentage of accessions recorded by the consortium which has taken steps to extend the detailed plan being adopted, but pretending to ignore some important circumstances:

1) The proposed legislation and the interpretation that they have been given by the authors of the detailed plan benefit beyond any reasonable criterion of equity holders of relatively small plots and those which already insist the buildings, which therefore have a strong interest in things to go forward on the path advocated the Councillor Melucci .

2) There is a group of non-members the consortium but significant minority, especially when assessing the land they owned, which is seen in their violated rights and interests and that is deeply unhappy with the situation.

3) Many of the members, in particular many of those who are not blatantly favored by the situation that has arisen, have joined the consortium primarily for fatigue, because "little is still better than nothing" and "an egg today is better a hen tomorrow. " To this contributed not a little to the statements made publicly several times according to which the Councillor Melucci, this is the only way possible, or you so, or do nothing. "

It is believed the contrary, for the reasons stated above, that this road is impassable and it is absolutely essential, before passing the point of no return, at least take this opportunity to "normalize" and rewrite the rule in effect balancing the PRG , and then adjust in the sense balancing the master plan also proposed.
It is believed that both should and could be done in quick times in the course of the adoption procedure in order not to disappoint the legitimate expectations of stakeholders and not subject to further unacceptable blackmail.

0 comments:

Post a Comment